Monday May 28 , 2018

Transmission lines :: Refineries :: Petrochemical Plants :: Pipelines :: Tank farms :: Industrial constructions

November 15th, 2014Lot 2- NIPP -Provisional Taking-Over certificfate

Dextron Engineering completes Engineering, Procurement and Construction of 330 kV double circuit transmission line from Makurdi- to- Aliade, part of NDPHC (NIPP) Lot 2 Project, 330KV D/C Makurdi-Aliade-Ugwaji (205 km) (Part A)

CLIENT:NIGER DELTA POWER HOLDING COMPANY OF NIGERIA

PROJECT NAME:Engineering, Procurement and Construction of 330 kV double circuit transmission line from Makurdi- to- Aliade.  (Part A)

CONTRACT TYPE:EPC

COMPLETION DATE:15THNOVEMBER 201

CONTRACT VALUE: TOTAL OFFSHORE: USD 10,765,310.14 + TOTAL ONSHORE:NGN 903,113,078.10

DESCRIPTION: The implementation of this line involved the erection of 109 Steel Latice Towers covering and overall length of 46 Kilometers. It was completed on the 15thof November 2015 (Please see Provisional Taking Over Certificate as attached)

MATERIAL SPPECIFICATION: The actualization of this project involved the usage of Steel lattice Towers coupled with Anti- Vandal bolts and nuts with classes of (Uplift and compression) Foundations ranging from Classes 1-4. The stringing involved the usage of TWIN ACSR Bison conductors, OPGW and Galvanized steel wires collaborated with accessories such as stockbridge dampers e.t.c

This project was a Joint Venture (JV) with AK-AY DIS. TIC. KOLL. STI, whose scope included design engineering, procurement, installation, pre-commissioning tests and commissioning for the New Haven North S/S Extension.