TRANSMISSION COMPANY OF NIGERIA (TCN)
Engineering, procurement and Construction of Reconstruction of Collapsed Tower 3Nos pn Jebba - Osogbo 330kV SC OTHL
ON GOING
TRANSMISSION COMPANY OF NIGERIA (TCN)
Engineering, procurement and Construction of 132kV Double Circuit Transmission line from Okpai - Kwale
ON GOING
TRANSMISSION COMPANY OF NIGERIA (TCN)
ON GOING
TRANSMISSION COMPANY OF NIGERIA (TCN)
Engineering, Procurement and Construction of 330kV Double Circuit Transmission Line
ON GOING
NATIONAL INTEGRATED POWER PROJECT
Construction of 1X7.5MVA 33/11kV injection substation at Jalingo town, (jalingo Business unit within Yola Distribution Zone) completed the following:
- 0.16km 33kV line
- 11kV feeders with total route length of 26.45km complete with HVDS cluster of 120No of 11/0.415kV CSP Transformers
COMPLETED
POWER HOLDING COMPANY OF NIGERIA Plc.
Comprising: Design, manufacture, supply, test, delivery to site and the installation of all materials and equipment needed and commissioning of 330kV single circuit transmission line of approximately 131km in length, from the existing Benin Main 330/132kV Substation to the existing Onitsha 330/132kV Substation
COMPLETED
NATIONAL INTEGRATED POWER PROJECT
330kV Markurdi-Aliade Double Circuit transmission line
COMPLETED
NATIONAL INTEGRATED POWER PROJECT
Engineering, Procurement and Construction of 132kv Benin North-Okada DC Transmission Line
COMPLETED
NATIONAL INTEGRATED POWER PROJECT
For Engineering procurement and construction of turn-in and turn-out towers with foundation, hardware and stringing to the substation gantries and to the entire transmission line onitsha-benin north 330kV, single circuit.
COMPLETED
TRANSMISSION COMPANY OF NIGERIA (TCN)
COMPLETED
TRANSMISSION COMPANY OF NIGERIA (TCN)
COMPLETED
NATIONAL INTEGRATED POWER PROJECT
Transmission Line - 330kv Turn in turn out dc oke aro-egbin/ikeja west T/L
COMPLETED
TRANSMISSION COMPANY OF NIGERIA (TCN)
COMPLETED
TRANSMISSION COMPANY OF NIGERIA (TCN)
Manufacture, supply, Delivery to site, Erection, installation of all Materials and Equipment needed for the realization and commissioning of the project.
COMPLETED
TRANSMISSION COMPANY OF NIGERIA (TCN)
Complete rehabilitation of Gusau-Talata Mafara 132kV single circuit transmission lines comprising 756 S/C towers, 20D/C towers and 1No. special connecting tower. All the glass disc insulators are replaced with composite insulators on all towes and other associated rehabilitation works.
COMPLETED
CHROME CONSORTIUM ENERGY, Beneficiary POWER HOLDING COMPANY OF NIGERIA Plc.
Design, maufacture, supply, construction and commissioning of the following permanent plant and equipment of the Gombe -Ngurore 330kV S/C line of 198.209km length.
- 330kV Single circuit overhead transmission line with circuit number E2Y on 596 No. galvanized steel lattice towers with ACSR 'Bison' conductor. 2No. conductors per phase, 1No. of overhead Optic Fibre Ground Wire (OPGW) and 1No. overhead galvanized earthwire.
- The towers are erected with anti-vandal bolts/nuts.
- The foundations are of pad and chimney type.
COMPLETED
POWER HOLDING COMPANY OF NIGERIA Plc.
Erection and Commissioning 47km of 132kV Single Circuit Transmission Line and the design, manufacture, supply, delivery to site, installation of all materials and equipment needed for the execution of the electromechanical works and commisioning of 5km Double Circuit 132kV Transmission Line.
COMPLETED
GILMOR ENGINRRTING (NIGERIA) LIMITED
Design, manufacture, supply, construction, erection and commisioning of all equipment, materials and works in respect of:
a) Re-routing of Ikeja West-Ayede 330kV Single Circuit Transmission Line at Owiwi Dam Project Site, Ogun State from Tower 400-405; approximately 2.8km long.
b) Re-routing of Papalanto- Abeokuta 132kV Single Circuit Transmission Line also at above Dam Project Site, form Tower 67-75; approximately 2.8km long.
COMPLETED
TRANSMISSION COMPANY OF NIGERIA (TCN)
Design, manufacture, supply, construction and commissioning of the following permanent plant and equipment:
- 330kV Double circuit overhead transmission line with circuit identiication number T1W and T2A on 38 No. galvanized steel lattice towers with ACSR "Bison" conductors - 2 No. conductors per phase, 1 No. overhead Optic Fiber Ground Wire (OPGW) and 1 No. overhead galvanized earthwire.
-The towers are erected with anti-vandal bolts/nuts upto bottom crossarm.
COMPLETED
Chevron Nigeria Ltd
Erecting/Rehabilitating 3 tanks, dismantling of 1 existing tank, general maintenance for equipments, construction of a flow station, construction of a pumping station, repair of metallic structures, repair/replacement of valves, repair/replacement of damaged instruments, overhaul of soot blowers.
COMPLETED
Baywood Continental Ltd., Nigeria.
Detail engineering (Process, Mechanical, Piping, Instruments, Civil, Hazop Study etc.) for increasing the capacity up to 10,000 BOPD crude oil and 60 mmscfd of gas, Technical assistance, Training, Witnessing of FAT.
COMPLETED
Chrome Consortium.
Maintenance and repairs of static equipment (reactors, columns, drums, vessels, heat exchangers, flare, piping, valves) in Areas 1, 2 and 3 and civil works at Port Harcourt Refining Company Ltd.
COMPLETED
Chrome Consortium.
For each boiler, dismantling of boiler casing, removal of air ducts and piping, insulation and refractory, pressure test and inspection, dismantling of headers, removal of superheaters, installation of new ones, dismantling of vaporizing banks panels and damaged tubes, extraction of tubes ends from vaporizer drums, preparation of drums bores for expansion, installation and expansion of new tubes, pressure test, installation of air ducts and piping, restoration of metallic structures, and casing, installation of internals inside steam drum, installation of burners, boxing-up of boiler, civil works.
COMPLETED
Chrome Consortium
Engineering and design, procurement and expediting, dismantling of old air grid and flue gas line, execution of 90” window in reactor’s shell, installation of new air grid and flue gas line, closing by welding of window, refractory works, civil works.
COMPLETED
KUWAIT SHIP BUILDING & REPAIR YARD CO. Kuwait Oil Company
COMPLETED
ROMPETROL RAFINARE PETROMIDIA COMPLEX
COMPLETED
CONSOLIDATED CONTRACTORS COMPANY (KUWAIT) Kuwait Oil Company
COMPLETED
BAYWOOD CONTINENTAL LTD Nigerian Petroleum Development Company
COMPLETED
CHEVRON NIGERIA LTD Baywood-Dextron Consortium
COMPLETED
SUDANESE PETROLEUM PIPING HOLDING COMPANY
COMPLETED
ACTIVE RESURSE COMPANY For UGUO Gas Processing Facility - Nigeria
COMPLETED